Thanks Mike bro
I tried Alphavantage sometime back, didnt work so left
Now, when you posted on it, I thought to give a try again and got the result but not satisfied.
The cons are:
- one scrip at a time, may give a try sometime with a JUGAAD to add multiple scrips at a time.
- time stamp not as per IST, so need editing
- max 100 rows of data at a time (so 5 min data will do but not 1 min data)
need to spend more time, to work on it, but wont be useful unless these cons are solved.
I tried Alphavantage sometime back, didnt work so left
Now, when you posted on it, I thought to give a try again and got the result but not satisfied.
The cons are:
- one scrip at a time, may give a try sometime with a JUGAAD to add multiple scrips at a time.
- time stamp not as per IST, so need editing
- max 100 rows of data at a time (so 5 min data will do but not 1 min data)
need to spend more time, to work on it, but wont be useful unless these cons are solved.